Construction Work and Engineering Projects

 

2022 Initiatives

  • Complete Bevan Fishing Pier recoating
  • Complete path resurfacing at Melville Park
  • Ardwell storm drain outfall replacement and associated surface works
  • Pump station improvements
  • Install a new downtown bike shelter
  • Work with VAA and District of North Saanich on the design of the Beacon Ave West Roundabout and Stirling Way realignment to be constructed in 2023
  • Complete Tulista Boat Launch float replacement
  • Complete the Eighth St sidewalk extension and tree planting
  • Improve sidewalk at Eastview Dr and Bevan Ave
  • Replace watermains on Amelia Ave, Henry Ave, Harbour Rd and Galaran Rd
  • Improve safety of Town Hall electrical service
  • Complete design and start construction of new public washrooms downtown, including a Changing Places washroom on the waterfront
  • Complete RCMP security fencing
  • Initiate the Active Transportation and Asset Management planning processes;
  • Replace the material in the Fifth St medians
  • Compete Rotary Park irrigation improvements
  • Continue reducing inflow and infiltration in sanitary sewer mains
  • Replace the roof on the Tourist Info Centre building
  • Install sidewalk on Orchard Ave between Second and Third St
  • Complete design and start construction of Lochside watermain replacement
  • Install sidewalk on Brethourpark Way to complete pedestrian link
  • Pave Parking Lot C at Fourth St and Sidney Ave
  • Complete Downtown Parking study
  • Complete stormwater alternatives study
 

 