2022 Initiatives
- Complete Bevan Fishing Pier recoating
- Complete path resurfacing at Melville Park
- Ardwell storm drain outfall replacement and associated surface works
- Pump station improvements
- Install a new downtown bike shelter
- Work with VAA and District of North Saanich on the design of the Beacon Ave West Roundabout and Stirling Way realignment to be constructed in 2023
- Complete Tulista Boat Launch float replacement
- Complete the Eighth St sidewalk extension and tree planting
- Improve sidewalk at Eastview Dr and Bevan Ave
- Replace watermains on Amelia Ave, Henry Ave, Harbour Rd and Galaran Rd
- Improve safety of Town Hall electrical service
- Complete design and start construction of new public washrooms downtown, including a Changing Places washroom on the waterfront
- Complete RCMP security fencing
- Initiate the Active Transportation and Asset Management planning processes;
- Replace the material in the Fifth St medians
- Compete Rotary Park irrigation improvements
- Continue reducing inflow and infiltration in sanitary sewer mains
- Replace the roof on the Tourist Info Centre building
- Install sidewalk on Orchard Ave between Second and Third St
- Complete design and start construction of Lochside watermain replacement
- Install sidewalk on Brethourpark Way to complete pedestrian link
- Pave Parking Lot C at Fourth St and Sidney Ave
- Complete Downtown Parking study
- Complete stormwater alternatives study