The Town of Sidney is updating Development Cost Charges Bylaw No. 1440. The Development Cost Charges (DCC) Bylaw was last updated in 1998. Development Cost Charges Fees help pay for infrastructure needed because of new growth.
The Town is also developing a new Amenity Cost Charges (ACC) Bylaw, as Sidney does not currently have an ACC program in place. Amenity Cost Charges are similar to DCCs, but focus on community amenities rather than core infrastructure.
Where are we today?
July 2025:
The draft DCC and ACC rates were presented at the July 14, 2025 Committee of the Whole meeting.
What’s next?
A virtual DCC and ACC information session for the development community and interested parties will be held on September 4, 2025, from 1:00 pm to 2:30 pm via Teams. The information session will include program details, a project timeline, and an opportunity for questions and discussion. Registration information can be found below.
Proposed DCC and ACC Rates
DCCs and ACCs are levied on a per lot or per dwelling unit basis for Low Density Residential and on a per unit basis for Medium Density Residential, and High Density Residential. Non-residential (Commercial, Industrial, and Institutional) uses will be levied per square metre of gross floor area.
The proposed DCC and ACC rates outlined below assume a 1% Municipal Assist Factor (MAF).
Land Use
Unit
Proposed DCC (1% MAF)
Proposed ACC (1% MAF)
Total
Low Density Residential
per lot / dwelling unit
$28,580.76
$608.49
$29,189.25
Medium Density Residential
per dwelling unit
$16,376.08
$414.06
$16,790.14
High Density Residential
per dwelling unit
$11,457.30
$252.04
$11,709.33
Commercial
per m2 Gross Floor Area (GFA)
$101.62
$0.40
$102.02
Industrial
per m2 GFA
$35.60
$0.16
$35.76
Institutional
per m2 GFA
$101.62
$0.40
$102.02
Additional Information
The definitions of the different types of residential density referred to in the proposed DCC and ACC rates are:
Low Density Residential: Single- and two-family dwellings, where each unit can include up to one secondary suite
Medium Density Residential: Buildings with 3 or more units that each have their own entrance (like townhouses, triplexes, or mobile homes) and in some cases accessory buildings
High Density: Multi-unit dwelling containing 3 or more self-contained units accessed through a common hallway (stacked)
Density Definition Graphic
DCCs are one-time fees collected to help communities recover the costs of off-site infrastructure needed for, or as a result of, growth. They are based on the principle of cost-sharing infrastructure between existing taxpayers and new development. They are a Provincially regulated tool; the Local Government Act sets out the general requirements under which local governments may administer DCC programs.
Funds generated through DCCs are intended for one-time capital costs (planning, engineering, design, legal, studies) and are only applied to growth-driven projects within the following categories:
- Transportation services
- Water services
- Drainage services
- Sewer services
- Parkland acquisition and improvements
- Fire protection facilities
- Police facilities
- Solid waste and recycling facilities
DCCs cannot be used for projects that serve the existing population (i.e., deficiencies, asset replacement) or for operations and maintenance costs. DCCs also cannot be used for projects otherwise eligible for ACCs.
ACCs are one-time fees collected to help communities finance amenities such as community centres, recreational facilities, libraries, daycares, and public spaces, if any of these are provided by the municipality. These amenities support liveable and complete communities in areas of growth. They are a Provincially regulated tool; the Local Government Act sets out the general requirements under which local governments may administer ACC programs.
DCCs are paid by applicants/developers at the time of:
- Subdivision, for approval to create new single-family lots (Low Density Residential); or,
- Building Permit, upon application to construct Medium or High Density Residential, Commercial, Industrial, or Institutional developments
When a new DCC Bylaw and/or ACC Bylaw is enacted, an existing development application submitted prior to the adoption of the new Bylaw(s) is granted 12-month in-stream protection.
In-stream protection will apply to both complete building permit and subdivision applications received prior to the adoption of any new DCC Bylaw and/or ACC Bylaw. Protection is also extended to rezoning and development permit applications that were completed prior to the adoption of any new DCC and/or ACC Bylaw and that will result in a building permit within 12 months of bylaw adoption. If an application meets the required criteria of being complete and is submitted prior to the adoption of the new DCC Bylaw and/or ACC Bylaw, it is provided protection from rate increases.
DCCs are not payable in these instances:
- Building which is solely for public worship
- Units with ≤ 29 m2 area
- Building Permit for work which does not exceed $50,000
- Where DCCs have been previously charged
- In-stream applications (complete)
ACCs are not payable in these instances:
- Building which is solely for public worship
- Units with ≤ 29 m2 area
- Building Permit for work which does not exceed $50,000
- In-stream applications (complete)
- Inclusionary housing
- Cooperative housing
- Supportive housing
- Transitional housing
- Emergency shelters
Under the Local Government Act, a local government may opt to impose a Bylaw through which DCCs or ACCs may be waived or reduced. DCC waivers or reductions can be provided in support of development resulting in the creation of affordable rental housing or reduced environmental impact. ACC waivers or reductions can be provided in support of affordable rental housing and low-impact development.
In the case of any waivers or reductions provided, the amount waived or reduced is to be entirely made up by the municipality.
Contact Information
To register for the DCC and ACC information session, please contact:
Urban Systems
For additional information or questions about the DCC & ACC Program Development, please contact:
Stay Informed
Sign up for email notifications from the Town of Sidney if you would like to know when this project webpage is updated.